We want to be completely transparent to avoid surprise costs and/or delays during your application so have detailed some potential additional costs which may occur depending on Local Authority’s requirements, location, design and scale of the proposed works. Some examples which may be required by third parties include;
Party Wall Notice and Award – A Party Wall Notice is a formal, written document served by a property owner to their neighbours before starting construction work on or near a shared wall, boundary, or structure. It provides legal notification of planned works, such as building on a boundary, altering a party wall, or excavating nearby, allowing neighbours to consent or dissent.
Depending on your neighbour’s response to the Party Wall Notice a Party Wall Award maybe required. This is a legally binding document that outlines terms for building work on or near a shared wall, boundary, or structure and is required when neighbours do not consent to a party wall notice and is implemented to protect the interests of all parties involved.
More information can be found at https://www.gov.uk/party-walls-building-works. Here at I Plan Architectural Services, we do not provide this service directly as it is best executed by a professional Party Wall Surveyor but we are happy to assist with obtaining quotes and any questions you may have regards it.
Build Over Agreements - Legally binding documents between a property owner and a water authority, required when constructing an extension or new structure within 3 metres of a public sewer or 1 metre of a lateral drain. They ensure the sewer is not damaged, ensure access for maintenance, and prevent the Local Authority from requiring the demolition of new structures if agreements aren’t in place.
There are multiple ways to obtain a build over agreement if required, by you the homeowner applying, by us and our Structural Engineer providing and submitting drawings (subject to an additional cost – please contact us for further information) or by your builder liaising directly with building control and the local water authority.
Area Weighted U-value Calculation - Most commonly required, when the total area of windows, doors, and rooflights in the proposed exceeds 25% of the extension's floor area most commonly in large glazed extensions, sunrooms and orangeries. Here at I Plan Architectural Services we do not provide this service directly as it is best executed by a professional accredited energy assessor but we are happy to assist with obtaining quotes and any questions you may have regards it.